Completion requirements, defined before the rush
Each unit, asset and building system carries a structured set of completion requirements — statutory, contractual and operational — agreed early rather than assembled in the final fortnight.
Planned UnifyOS module · Handover & completion intelligence
Handover is where delivery risk concentrates: snag lists, statutory certificates, testing and commissioning records, warranties, O&M documentation and as-built information all land at once, usually against a fixed opening or occupation date.
The planned handover module tracks completion evidence as a structured set of requirements per unit, asset and system, so readiness is measured against what has actually been supplied and verified.
In design — informed by live retail and mixed-use handovers
These modules are roadmap positions within UnifyOS. They are in design or scoping, are not available today, and no delivery dates are committed. They are published so clients can see the direction of the platform and shape it — not to imply released functionality.
The problem
The intent
Data it would work from
Capabilities
Worked through with delivery teams running live completions, so the design starts from how handover actually behaves.
Each unit, asset and building system carries a structured set of completion requirements — statutory, contractual and operational — agreed early rather than assembled in the final fortnight.
Certificates, test and commissioning records, warranties, O&M documents and as-builts are read on arrival and matched to the requirement they satisfy, with the source document retained as the evidence behind it.
Missing, expired, mismatched or unsigned records are flagged against the requirement, so a pack is not accepted simply because a folder is full.
Snags and defects close on evidence of rectification — inspection record, photograph, retest — rather than on a status change by the party responsible for the work.
Readiness for occupation, trading or beneficial use is scored per unit and rolled up across the scheme, showing what is genuinely ready and what is being carried.
Items that legally gate occupation are separated from items that merely tidy the record, so attention goes where the opening date is actually at risk.
The accepted evidence assembles itself into the handover record for each unit and system, ready to become the operating baseline instead of a box of documents.
What it produces
Readiness position per unit and per scheme
One evidence-backed view of what is ready, what is outstanding and who owes it.
Statutory and certificate register
Every required certificate, its status, its expiry and the document behind it.
Rectification record
Open and closed snags with the evidence that closed them and the date it was verified.
Handover and O&M pack
The structured asset, system and warranty record handed to the operating team.
Exception report for the opening date
Only the items that gate occupation, ranked by the risk they carry to the date.
Who it is for
Delivery and project managers
See real completion status instead of a reported percentage, early enough to act on it.
Landlords and asset owners
Accept units on verified evidence, with a defensible record of what was accepted and when.
Commercial and contract teams
Hold completion positions, retention and warranty obligations against the responsible party.
Operating and facilities teams
Inherit a structured asset record rather than reconstructing one after occupation.
Where the line sits
The boundaries matter as much as the capability.
Roadmap position · Next
Sequencing is driven by dependencies, not by marketing convenience. Nothing here is available today and no delivery date is committed.
Depends on
Already in place
Still needed — In design
See where this sits against every other module on the UnifyOS roadmap.
Inside UnifyOS
Every module shares the same governance, evidence and audit standards, so intelligence carries forward instead of being rebuilt.
Handover readiness feeds the opening-readiness view for each unit and the wider scheme.
Completion evidence gaps surface as programme risk before they hit the occupation date.
The verified asset record becomes the operating baseline rather than a box of documents.
Client systems connect through IntelliBridge™, so this module would read from and write back to the platforms you already run.
Requirements from live portfolios shape what gets built first — and what gets built at all.